|
1
|
20264A1A44FA 5FD2 4431 9A79 8AE402B46B98128IRR /
2026_HRY_511370_1
|
Laying underground RCC NP-3 Pipeline for dewaterin
Laying underground RCC NP-3 Pipeline for dewatering of flood water from main pond and field area of village Dang Khurd and outfall at RD 65000-R of Nigana Feeder
|
Irrigation & Water Resources Department
Jui W. S. Divn. Bhiwani[Jui W.S. Divn. Bhiwani]
|
02-Apr-2026 09:00 AM
| ₹ 87,72,849.00 | ₹ 1,75,460.00 |
|
|
|
|
2
|
2026D4CF5240 8D52 4C2D 9ED0 9037D5B7C085128IRR /
2026_HRY_511368_1
|
Laying underground RCC NP-3 Pipeline for dewaterin
Laying underground RCC NP-3 Pipeline for dewatering of flood water from field area of village Ghushkani and outfall at RD 8350-L of Nigana Feeder
|
Irrigation & Water Resources Department
Jui W. S. Divn. Bhiwani[Jui W.S. Divn. Bhiwani]
|
02-Apr-2026 09:00 AM
| ₹ 84,08,496.00 | ₹ 1,68,170.00 |
|
|
|
|
3
|
2026E88E4949 949D 42E5 B3AC 8C1EAB1D054B1809ULB /
2026_HRY_509501_1
|
providing and laying water supply distribution pip
providing and laying water supply distribution pipe line in village Baskushla, zone-5, ward no.7 under Mc Manesar limit. REcall I
|
Municipal Corporation/Urban Local Bodies
Municipal Corporation Manesar
|
02-Apr-2026 11:00 AM
| ₹ 1,75,35,948.00 | ₹ 3,50,720.00 |
|
|
|
|
4
|
202668DB74F4 788D 4F33 909C 71C74455FC10637BAR /
2026_HRY_510567_1
|
Improvement by providing st...
Improvement by providing strengthing on Balour Sidipur Isherheri
|
Public Works Department
Provincial Division PWD B and R Branch[PD Bahadurgarh]
|
02-Apr-2026 11:00 AM
| ₹ 88,48,000.00 | ₹ 1,77,000.00 |
|
|
|
|
5
|
202680CA1557 04C2 4F23 BCE1 A0E4ED480DF8554PUH /
2026_HRY_510800_1
|
A/Mtc Water supply Scheme V...
Supply and erection of 20 HP Pumping machinery Set att BS Amru Pana Village Kalinga
|
Public Health Engineering Department
Bhiwani PHED No.2[Bhiwani PHED No. 2]
|
02-Apr-2026 11:00 AM
| ₹ 4,25,966.00 | ₹ 8,520.00 |
|
|
|
|
6
|
2026D28C03BC 42F9 48B6 9242 7694B5CF25131062HVP /
2026_HBC_510946_1
|
NIT No. 42/AMB/66 KV Jalkheri/2025-26
Augmentation of 66 KV S/Stn.Jalkheri, from (2x12.5_16 MVA) to (1x12.5_16 MVA plus 1x25_31.5 MVA) 66_11 KV TF
|
Haryana Vidyut Prasaran Nigam Limited
XEN TS Division office, HVPNL, Ambala[XEN TS Division, HVPNL, Ambala]
|
02-Apr-2026 09:00 AM
| ₹ 7,73,230.00 | ₹ 15,465.00 |
|
|
|
|
7
|
20269E9D350E 77EC 4EC6 80E6 EF7DEF6148691954HSA /
2026_HBC_510534_1
|
Pdg. Electrification in One No. new covered shed (
Pdg. Electrification in One No. new covered shed (18 bays 24 m wide) in NGM at Siwani
|
Haryana State Agriculture Marketing Board Panchkula
Electrical Division Rohtak[Division Rohtak Electrical]
|
02-Apr-2026 11:00 AM
| ₹ 4,61,177.00 | ₹ 9,300.00 |
|
|
|
|
8
|
2026344A4F9B 226F 4190 950F D775CFEC8C32143IRR /
2026_HRY_511303_1
|
Supply and installation of 500 KVA D.G set woth of
Supply and installation of 500 KVA D.G set woth of AMF Control panel at Mahesh Nagar Drain pump house
|
Irrigation & Water Resources Department
SYL W.S. Divn. Ambala
|
02-Apr-2026 11:00 AM
| ₹ 44,63,717.00 | ₹ 89,300.00 |
|
|
|
|
9
|
2026A02AFCC2 48C1 48C3 8A0B 8AE11A81FACA143IRR /
2026_HRY_511339_1
|
Supply and installation of 500 KVA DG set with of
Supply and installation of 500 KVA DG set with of AMF contral panel at Ghel Drain pump house
|
Irrigation & Water Resources Department
SYL W.S. Divn. Ambala
|
02-Apr-2026 11:00 AM
| ₹ 40,31,917.00 | ₹ 80,700.00 |
|
|
|
|
10
|
20263A3496F7 FAF9 45C2 8CEB F4B023FA2FDB143IRR /
2026_HRY_511227_1
|
Construction of bridge across Mahesh Nagar drain i
Construction of bridge across Mahesh Nagar drain including opening for water way to new pump house and rehabilitation of old pump house building including M S Trash rack with foot bridge, boundary wall with main gate etc.
|
Irrigation & Water Resources Department
SYL W.S. Divn. Ambala
|
02-Apr-2026 11:00 AM
| ₹ 1,66,30,368.00 | ₹ 3,32,700.00 |
|
|
|
|
11
|
202665EAD721 33CC 482F 80DB 4040B0F31F16143IRR /
2026_HRY_511350_1
|
Supply and installation of 500 KVA DG set with of
Supply and installation of 500 KVA DG set with of AMF Control panel at SYL Parallel drain pump house
|
Irrigation & Water Resources Department
SYL W.S. Divn. Ambala
|
02-Apr-2026 11:00 AM
| ₹ 40,31,917.00 | ₹ 80,700.00 |
|
|
|
|
12
|
202622574C6C 0D34 4128 9241 EEC2A9B7E815584PUH /
2026_HRY_511165_1
|
Akanwali and Dariypur O and M 10.04 lakhs
Comprehensive Mtc and Operation of Distributions Consumable items TandP items safety equipments Taking out Top layer filter media and replacing the same after screened washed and cleaned Comprehensive Mtc Operation Repair and desilting
|
Public Health Engineering Department
Fatehabad PHED
|
02-Apr-2026 12:00 PM
| ₹ 10,03,928.00 | ₹ 20,100.00 |
|
|
|
|
13
|
2026702C58CD 43BD 41CD B6D1 64FFE7E13D42299ULB /
2026_HRY_510780_1
|
Renovation and repair works, Construction of Rooms
Renovation and repair works, Construction of Rooms, toilet - 2No. at mc office (Mohta Market), MC Sirsa (2nd Time Tender)
|
Municipal Corporation/Urban Local Bodies
Municipal Council Sirsa
|
02-Apr-2026 10:00 AM
| ₹ 27,58,931.00 | ₹ 65,200.00 |
|
|
|
|
14
|
2026BE1978E7 D0D5 4825 A5B1 34BF03160DF8210IRR /
2026_HRY_510335_1
|
Estimate for I/C work of Ra...
I/C work of Rabhra Puthi Link Drain
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 29,113.00 | ₹ 580.00 |
|
|
|
|
15
|
202656BA30A9 9763 4974 9B27 BC09957D1B13210IRR /
2026_HRY_510337_1
|
Estimate for I/C Work of Bh...
I/C Work of Bhainswan Sub Link Drain
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 16,316.00 | ₹ 320.00 |
|
|
|
|
16
|
202682629352 95F1 453B 91D1 76BFAC870CD0210IRR /
2026_HRY_510350_1
|
Estimate for I/C of lath li...
Estimate for I/C of lath link drain RD 0 to tail during 2026
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 57,056.00 | ₹ 1,140.00 |
|
|
|
|
17
|
20267F091343 51DF 4313 8C4C B52BD592204D210IRR /
2026_HRY_510333_1
|
Estimate for I/C of Kakana ...
I/C of Kakana Link Drain, Bajana Kasandi Link Drain, Niyat Link Drain, Kasanda Link Drain No. 1 and 2 from 0 to tail
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 1,03,236.00 | ₹ 2,060.00 |
|
|
|
|
18
|
202623A7BB57 DF38 4D35 BFF4 AB37A35AEB5B210IRR /
2026_HRY_510351_1
|
Estimate for I/C work of Sa...
I/C work of Samri Link Drain
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 1,61,262.00 | ₹ 3,220.00 |
|
|
|
|
19
|
202635E4BC18 786F 4F03 BFF0 0B1275E7742A596PUH /
2026_HRY_510861_1
|
Bhukri - Estimate of Provid...
Providing and installing 1 No. new tubewell in place of failed
|
Public Health Engineering Department
Kurukshetra PHED
|
02-Apr-2026 12:00 PM
| ₹ 15,44,323.00 | ₹ 30,886.00 |
|
|
|
|
20
|
2026688E0654 E3EC 467B B233 AD0C1E641944210IRR /
2026_HRY_510336_1
|
Estimate for I/C work of Bu...
I/C work of Busana-Siwanka Link Drain
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 78,477.00 | ₹ 1,560.00 |
|
|
|
|
21
|
202645A74D5D CD07 4C1F 8F2D 4E3A1F5D421A210IRR /
2026_HRY_510331_1
|
Estimate for I/C of Kheri D...
I/C of Kheri Damkan Link Drain
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 74,039.00 | ₹ 1,480.00 |
|
|
|
|
22
|
2026C239F391 85CE 4A37 85B9 3916E1F1EFEB210IRR /
2026_HRY_510327_1
|
Estimate for I/C of Bidhal ...
I/C of Bidhal link drain No 1 and 2 from RD 0 to tail during 2026
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 96,155.00 | ₹ 1,920.00 |
|
|
|
|
23
|
2026C1C86F70 9998 443C B9FE 26E9CCB74EED286ULB /
2026_HRY_511268_1
|
Providing and laying of sewer line in Narayan Sing
Providing and laying of sewer line in Narayan Singh park, weavers colony,labour colony and assandh road in ward no 23 M.C. Panipat
|
Municipal Corporation/Urban Local Bodies
Municipal Corporation Panipat
|
02-Apr-2026 01:00 PM
| ₹ 20,93,517.00 | ₹ 41,880.00 |
|
|
|
|
24
|
2026D667C2E3 3875 464F A1C7 AF1FA0F88AFA210IRR /
2026_HRY_510348_1
|
Estimate for I/C work of Bi...
I/C work of Bijawa-Chidana-Mundlana Link Drain
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 1,23,548.00 | ₹ 2,480.00 |
|
|
|
|
25
|
20269C736B1E CE2E 4C50 9311 B3BB98070981210IRR /
2026_HRY_510349_1
|
Estimate for I/C Rewara lin...
Estimate for I/C Rewara link drian, Saragthal link drain and Bhainswal link drain from RD 0 to Tail during 2026
|
Irrigation & Water Resources Department
W.S. Divn. Gohana[W.S.Division Gohana]
|
02-Apr-2026 11:00 AM
| ₹ 56,995.00 | ₹ 1,140.00 |
|
|
|