|
1
|
2025A21ADC86 871C 47D5 AA7A 1D58DE9558FB593PUH /
2025_HRY_483573_1
|
Getting raw water from GWS Channel to Existing and
Getting raw water from GWS Channel to Existing and Proposed 2nd Water Works Asoda Todran and Construction of 2nd Water Works at village Asoda Todran, Construction of 1 No. RCC S.S Tank of size 149x149x6 Ft. or 45.42x45.42x1.83 Mtrs. Repair of existin
|
Public Health Engineering Department
Bahadurgarh PHED
|
29-Nov-2025 03:00 PM
| ₹ 5,69,41,960.00 | ₹ 11,38,840.00 |
|
|
|
|
2
|
2025A2EF0B6B 8395 40E6 82FD E40F516456C9688DEV /
2025_HRY_484437_1
|
Construction of Rasta (Sahid smarak to towards Kha
Construction of Rasta (Sahid smarak to towards Khatiwala johad)
|
Development and Panchayat
Executive Engineer Panchayati Raj Bhiwani[Executive Engineer Bhiwani]
|
29-Nov-2025 03:00 PM
| ₹ 4,20,638.00 | ₹ 8,420.00 |
|
|
|
|
3
|
202592677DE0 1EA7 48D7 83C7 924BBCC8FE67688DEV /
2025_HRY_484448_1
|
Construction of Rasta(Ladunda Rasta to Hinduwala J
Construction of Rasta(Ladunda Rasta to Hinduwala Johad)
|
Development and Panchayat
Executive Engineer Panchayati Raj Bhiwani[Executive Engineer Bhiwani]
|
29-Nov-2025 03:00 PM
| ₹ 4,20,268.00 | ₹ 8,400.00 |
|
|
|
|
4
|
20251A2B04A3 D03F 4377 ABD4 927EC224302B624BAR /
2025_HRY_484562_1
|
Rehabilitation of Two lane ROB at LC-553 on Hodal
Rehabilitation of Two lane ROB at LC-553 on Hodal Hassanpur road in Palwal District (Without GST)
|
Public Works Department
PWD B and R[PD Palwal]
|
29-Nov-2025 05:00 PM
| ₹ 94,01,000.00 | ₹ 1,88,020.00 |
|
|
|
|
5
|
2025EA06A8EB 23A8 4D50 BAD9 E4F66C69B1C6292ULB /
2025_HRY_484074_1
|
956 Estimate for laying of ...
Estimate for laying of hdpe pipe line behind kabir ashram near drain puliya (mama bhanja chowk) in ward no.11 (Re-called)
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 1,91,015.00 | ₹ 4,000.00 |
|
|
|
|
6
|
202560E9C655 ED73 43C6 9410 3135CDEDE98E286ULB /
2025_HRY_485270_1
|
Providing and laying of 80 mm thick ibps in indo f
Providing and laying of 80 mm thick ibps in indo farm wali gali in malik enclave in ward no. 14 MC Panipat (rural) (For LC Society)
|
Municipal Corporation/Urban Local Bodies
Municipal Corporation Panipat
|
01-Dec-2025 09:00 AM
| ₹ 18,57,147.00 | ₹ 38,000.00 |
|
|
|
|
7
|
2025506A8283 5E8E 451C 8CEF D865D041B0B8332ULB /
2025_HRY_485112_1
|
Construction of aspirational toilet in sector 06 W
Construction of aspirational toilet in sector 06 Ward No. 2 im MC Dharuhera
|
Municipal Corporation/Urban Local Bodies
Municipal Committee Dharuhera
|
29-Nov-2025 05:00 PM
| ₹ 19,00,119.00 | ₹ 38,002.00 |
|
|
|
|
8
|
2025A8E96AB0 3AF1 44F7 B469 C8ABBAD8CB77332ULB /
2025_HRY_485120_1
|
Const. of toe wall for road in Shiv Nagar Gali No
Const. of toe wall for road in Shiv Nagar Gali No 1 in ward No 12 in MC Dharuhera
|
Municipal Corporation/Urban Local Bodies
Municipal Committee Dharuhera
|
29-Nov-2025 05:00 PM
| ₹ 4,73,062.00 | ₹ 9,461.00 |
|
|
|
|
9
|
20254E9293A8 1348 42FC BAFE 76BE5F31C596332ULB /
2025_HRY_485121_1
|
Annual operation repair and maintenance of Street
Annual operation repair and maintenance of Street lights
on Sohna Road and NRP Bass Road in MC limit, MC
Dharuhera (For year 2025-26)
|
Municipal Corporation/Urban Local Bodies
Municipal Committee Dharuhera
|
29-Nov-2025 05:00 PM
| ₹ 5,72,570.00 | ₹ 11,451.00 |
|
|
|
|
10
|
2025BBF66214 699D 4FDF ADBA 94FD6D2658F9624BAR /
2025_HRY_484550_1
|
Special Repair of Two lane ROB at LC-566 on Palwal
Special Repair of Two lane ROB at LC-566 on Palwal Alawalpur Mohna road (ID 3570 and 3602) RD 0.34 to 1.36km in Palwal District (Without GST)
|
Public Works Department
PWD B and R[PD Palwal]
|
29-Nov-2025 05:00 PM
| ₹ 93,35,000.00 | ₹ 1,86,700.00 |
|
|
|
|
11
|
20254BA92FD1 E602 4FDC 9C48 E2FE6E3E22E7292ULB /
2025_HRY_485000_1
|
1060 Construction of Hall i...
Construction of Hall in first floor including Library in Lehrara ward 16 Under Mc Sonipat(recall)
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 35,90,478.00 | ₹ 72,000.00 |
|
|
|
|
12
|
2025AE51DDC3 8692 4EB0 B7E6 6E5FEB54E60B292ULB /
2025_HRY_484558_1
|
983-Development of Green Be...recall
Development of Green Belt in front of Swarn jayanti park Mehlana road
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 91,56,255.00 | ₹ 2,00,000.00 |
|
|
|
|
13
|
2025922AA175 639F 4B62 AF8C 4DBA2247C20F332ULB /
2025_HRY_485114_1
|
Const. of floor, side MS sheeting and other work o
Const. of floor, side MS sheeting and other work of garbage collection point on Sohna road in ward No. 4 in MC Dharuhera.
|
Municipal Corporation/Urban Local Bodies
Municipal Committee Dharuhera
|
29-Nov-2025 05:00 PM
| ₹ 8,72,761.00 | ₹ 17,455.00 |
|
|
|
|
14
|
20254EB228EA C2AF 4CF8 A313 5CF0B67345B6332ULB /
2025_HRY_485125_1
|
Const. of street from NRP Bass road to First step
Const. of street from NRP Bass road to First step play school, Gayatri Mandir wali gali, H/o Subhash to H/o Ashok, H/o Sunil to Ram Singh, Gayatri Mandir to Sri Ram and Ratiram to Sonu in Ward No. 11 in MC Dharuhera.
|
Municipal Corporation/Urban Local Bodies
Municipal Committee Dharuhera
|
29-Nov-2025 05:00 PM
| ₹ 21,09,544.00 | ₹ 42,190.00 |
|
|
|
|
15
|
20255D79CF63 271C 4D95 AC2F AA65F2D0C0FE292ULB /
2025_HRY_484435_1
|
1126Estimate for the Renova...
Estimate for the Renovation of Samaj Sewa Samiti in Kabirpur ward-13 under MC Sonipat
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 11,45,427.00 | ₹ 46,000.00 |
|
|
|
|
16
|
2025BD8DB796 E39F 45BB B067 3A488160B53C292ULB /
2025_HRY_484249_1
|
1121Construction of street ...
Construction of street from 100 foota road to H/o Samunder in Shastri colony ward no. 19 in MC Sonepat .
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 26,87,606.00 | ₹ 54,000.00 |
|
|
|
|
17
|
20252998F9A4 1894 4C69 BE8D B1C5E40F18C6292ULB /
2025_HRY_484063_1
|
958 Providing and laying of...
Providing and laying of sewer line of connecting road of habitate club to gohana road via hindu college of pharmacy ward no. 20 MC Sonipat.(Re-called)
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 21,68,126.00 | ₹ 44,000.00 |
|
|
|
|
18
|
202586EA2679 B5F6 4D6A 9CC1 A9032F697C4E332ULB /
2025_HRY_485108_1
|
P/ Fixing of 100 Nos CC Benches at various locatio
P/ Fixing of 100 Nos CC Benches at various locations in MC Dharuhera.
|
Municipal Corporation/Urban Local Bodies
Municipal Committee Dharuhera
|
29-Nov-2025 05:00 PM
| ₹ 4,81,400.00 | ₹ 9,628.00 |
|
|
|
|
19
|
2025B899348D 0056 48CB 8D7E 77A2FDD7A1CB292ULB /
2025_HRY_484251_1
|
1120Estimate for Providing ...
Estimate for Providing and laying of Mastic Asphalt in Gur mandi of Ward no. 15 in M.C Sonipat
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 34,69,807.00 | ₹ 70,000.00 |
|
|
|
|
20
|
20254327BFD0 11ED 4D87 B0A6 D4A2162234D8292ULB /
2025_HRY_484253_1
|
1034 Construction of street...
Construction of street in front of Holy Child School and Branches street in street no 6 and 7 in Narender nagar ward no 14 under MC Sonipat(Re-call)
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 41,89,355.00 | ₹ 84,000.00 |
|
|
|
|
21
|
20258644786B CE67 47BD BCB7 A403F095C554292ULB /
2025_HRY_484231_1
|
Estimate from Raising of C....
Estimate from raining of C.C Street in Pancham Nagar Around ward -12 under MC Sonipat(Re-called)
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 7,52,028.00 | ₹ 16,000.00 |
|
|
|
|
22
|
20256DB3E350 79E9 4C21 BFC0 0E0018224189292ULB /
2025_HRY_484079_1
|
1063 Renovation work of Ban...
Renovation of Bandaveer Bairagi community center (saraswati vihar) in ward no.19 under MC Sonipat(Re-called)
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 9,38,964.00 | ₹ 20,000.00 |
|
|
|
|
23
|
2025E5FB6084 0D37 4A19 B0C1 685A29440A06292ULB /
2025_HRY_484433_1
|
1125Desilting of different ...
Desilting of different sewer line in various area of ward no 17 under MC Sonipat
|
Municipal Corporation/Urban Local Bodies
Muncipal Corporation Sonipat
|
01-Dec-2025 09:00 AM
| ₹ 22,50,775.00 | ₹ 24,000.00 |
|
|
|
|
24
|
20251FB97D2E 0004 4611 9A9A 4A32A6D20A89284ULB /
2025_HRY_484154_1
|
Estimate for P/L 300mm dia. sewer line and 100mm d
Estimate for P/L 300mm dia. sewer line and 100mm dia. DI water supply line at Palika Bazaar Sihi Gate Road in Ward No. 43, Ballabgarh.Recall
|
Municipal Corporation/Urban Local Bodies
Municipal Corporation Faridabad
|
29-Nov-2025 06:55 PM
| ₹ 5,91,201.00 | ₹ 11,820.00 |
|
|
|
|
25
|
202533C034CB B071 42B1 8F86 8E10D6D2B682284ULB /
2025_HRY_484269_1
|
Estimate for providing and laying RMC M-25 grade a
Estimate for providing and laying RMC M-25 grade and M-40 interlocking tiles in DP door wali gali , near Nalanda school Adarsh Nagar in ward no. 46 , Ballabhgarh.Recall
|
Municipal Corporation/Urban Local Bodies
Municipal Corporation Faridabad
|
29-Nov-2025 06:55 PM
| ₹ 38,74,479.00 | ₹ 77,480.00 |
|
|
|